Cape Cod Remodeling Blog | @designREMODEL

Cold! Very Cold! Remodeling Repeat Weeks 4-5 — @designREMODEL

Written by John Clark | Jan. 31, 2015

It's been a busy couple of weeks out on Scraggy Neck, Cataumet. The low temperatures and high winds have combined for some tough working conditions in the last week! Below, we have just started removing the front roof in preparation for the construction of the third floor.

Back wall is now removed and the winds are starting to howl. Perfect timing!

Room with a view!

Men At Work!

Ultimate Skylight!

Dusk settles over the open roof...

Wind block..um wall goes up!

Framing the third floor.

Third floor goes up.

Closing in the roof prior to an expected rainstorm.

Closing out another day on Scraggy Neck.